|
PROBLEM: On February 8, 2010, HBD Contracting contacted HELITECH for an estimate at a retail establishment in Shiloh, Illinois. The floor on the inside of the store was settling and required a solution to stop the settling and cracking.
SOLUTION: The solution that HELITECH used to solve the store’s problems was a process called slab jacking or lime grout injection. This procedure was successful at stopping movement to the interior floor slab.
|